The High-Capacity Grid Act, designated as H.R. 6633 in the 119th Congress and introduced on December 11, 2025, aims to address issues related to the grid infrastructure. The bill focuses on enhancing the capacity of the grid, likely intending to improve energy transmission and distribution efficiency. Specific provisions and directives within the bill are not detailed in the provided context. You can find the complete text and details of the bill on the official PDF version available at https://www.congress.gov/119/bills/hr6633/BILLS-119hr6633ih.pdf.

Congressional Summary of HR 6633

High-Capacity Grid Act

This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills.

Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable.

A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility.

The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.

Current Status of Bill HR 6633

Bill HR 6633 is currently in the status of Bill Introduced since December 11, 2025. Bill HR 6633 was introduced during Congress 119 and was introduced to the House on December 11, 2025.  Bill HR 6633's most recent activity was Ordered to be Reported (Amended) by the Yeas and Nays: 49 - 0. as of July 21, 2026

Bipartisan Support of Bill HR 6633

Total Number of Sponsors
1
Democrat Sponsors
0
Republican Sponsors
1
Unaffiliated Sponsors
0
Total Number of Cosponsors
5
Democrat Cosponsors
0
Republican Cosponsors
5
Unaffiliated Cosponsors
0

Policy Area and Potential Impact of Bill HR 6633

Primary Policy Focus

Energy

Alternate Title(s) of Bill HR 6633

To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.
To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.