11
High-Capacity Grid Act
8/1/2026, 8:06 AM
Summary of Bill HR 6633
Congressional Summary of HR 6633
High-Capacity Grid Act
This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills.
Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable.
A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility.
The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.
Read the Full Bill
Current Status of Bill HR 6633
Bipartisan Support of Bill HR 6633
Total Number of Sponsors
1Democrat Sponsors
0Republican Sponsors
1Unaffiliated Sponsors
0Total Number of Cosponsors
5Democrat Cosponsors
0Republican Cosponsors
5Unaffiliated Cosponsors
0Policy Area and Potential Impact of Bill HR 6633
Primary Policy Focus
EnergyAlternate Title(s) of Bill HR 6633
Comments

Kylen O'Donnell
2 months ago
This bill gonna make our power grid stronger. It good for everyone in the US.