0
Government Accountability Office Awarded a Contract to KPMG LLP for $5,078,326.34
Signed on
2/24/2022, 12:00 AM
KPMG LLP Government Contract #05GA0A22F0009
KPMG LLP was awarded a contract with the United States Government for $5,078,326.34. The contract was awarded by the agency office US GAO ACQUISITION MANAGEMENT, which is a division with the GAO, Except Comptroller General within the Government Accountability Office.
Summary of Award
The recipient of the federal contract is KPMG LLP, a U.S.-owned business located in McLean, Virginia. They are providing financial management and assurance team information system audit support services for the Schedule of Federal Debt. The contract, funded by the Government Accountability Office, is worth $4,000,749.48. Notable transactions include various financial actions, with one transaction amounting to $1,055,732.27 and another at -$144,935.64.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,055,732.27 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,034,372.97 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $71,167.67 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,013,536.68 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,115,811.17 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $105,498.94 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-105,498.94 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.65 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,055,732.27 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,034,372.97 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $71,167.67 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,013,536.68 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,115,811.17 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-39,436.70 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,077,576.86 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $105,498.94 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-105,498.94 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.65 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,055,732.27 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,034,372.97 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $71,167.67 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,013,536.68 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,115,811.17 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-39,436.70 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,077,576.86 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $105,498.94 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-105,498.94 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.65 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,055,732.27 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $-144,935.64 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,034,372.97 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $71,167.67 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,013,536.68 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $0.00 to KPMG LLP. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
GAO, Except Comptroller General, a sub agency of Government Accountability Office, issued a payment of $1,115,811.17 to KPMG LLP. The payment included a Subsidy Cost of $0.00.