General Services Administration Awarded a Contract to SUMMIT TECHNOLOGIES INC for $475,000.00
Signed on
7/1/2015, 12:00 AM
SUMMIT TECHNOLOGIES INC Government Contract #GS35F398CA
SUMMIT TECHNOLOGIES INC was awarded a contract with the United States Government for $475,000.00. The contract was awarded by the agency office GSA/FAS CENTER FOR IT SCHEDULE PROG, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
The recipient of this federal contract is Summit Technologies Inc, based in Hartford, Connecticut. The contract is a Federal Supply Schedule Contract for IT and telecommunications services worth $475,000. The funding agency is the General Services Administration, awarded through the Federal Acquisition Service. No notable transactions are recorded at this time.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to SUMMIT TECHNOLOGIES INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.