0
General Services Administration Awarded a Contract to VERACITY CONSULTING, INC. for $12,523,103.00
Signed on
3/5/2015, 12:00 AM
VERACITY CONSULTING, INC. Government Contract #GS35F213CA
VERACITY CONSULTING, INC. was awarded a contract with the United States Government for $12,523,103.00. The contract was awarded by the agency office GSA/FAS CENTER FOR IT SCHEDULE PROG, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
Veracity Consulting, Inc. has been awarded a Federal Supply Schedule Contract (IDV) with the General Services Administration's Federal Acquisition Service. The contract, with a total obligation of $12,523,103, was signed on March 5, 2015, and is set to run from March 10, 2015, to March 9, 2030.
Veracity Consulting, Inc. is based in Overland Park, Kansas, and offers IT and telecommunications services, specifically in the category of Other IT and Telecommunications. The company holds various certifications and designations, including being a Small Business, Woman-Owned Business, and U.S.-Owned Business.
The contract was awarded through a negotiated proposal/quote process, with full and open competition. Veracity Consulting, Inc. was one of 999 offers received for the contract, with no preference used in the evaluation process. The contract is for commercial products/services, with a firm-fixed price contract pricing structure.
The funding agency for the contract is the General Services Administration, specifically the Federal Acquisition Service Center for IT Schedule Program. The awarding agency is also the General Services Administration, with the same sub-agency involved in the contract.
The contract falls under the product or service code D399 for IT and Telecom- Other IT and Telecommunications, and the NAICS code 541519 for Other Computer Related Services.
The recipient, Veracity Consulting, Inc., is a U.S.-owned business with a range of certifications and designations that qualify it for government contracts. The company is located in Johnson County, Kansas, and has a history of providing IT and telecommunications services to various clients.
Overall, the contract between the U.S. federal government and Veracity Consulting, Inc. represents a significant investment in IT and telecommunications services, with a focus on Other IT and Telecommunications. The contract is structured as a firm-fixed price agreement, with full and open competition in the award process. Veracity Consulting, Inc. is well-positioned to deliver on the requirements of the contract, given its expertise in the field and its track record of providing quality services to clients.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to VERACITY CONSULTING, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.