0
General Services Administration Awarded a Contract to CHICAGO TECH INC for $498,830.00
Signed on
3/13/2012, 12:00 AM
CHICAGO TECH INC Government Contract #GS35F0258Y
CHICAGO TECH INC was awarded a contract with the United States Government for $498,830.00. The contract was awarded by the agency office GSA/FAS CENTER FOR IT SCHEDULE PROG, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
Chicago Tech Inc, a U.S.-Owned Small Business in Illinois, has a Federal Supply Schedule contract for Information Technology Equipment System Configuration with the General Services Administration's Federal Acquisition Service. The contract is worth $498,830 and involves electronic computer manufacturing. No transactions have been recorded yet.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CHICAGO TECH INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.