GONNEVILLE INC was awarded a contract with the United States Government for $504,766.00. The contract was awarded by the agency office GSA/FAS/GSS/QSCA, MULTIPLE AWARD SCHEDULE CONTRACTING DIVISION, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
The awarded contract between the US federal government and GONNEVILLE INC, a U.S.-owned business based in San Juan Capistrano, California, involves a Federal Supply Schedule Contract for miscellaneous vehicular components. The contract was signed on February 2, 2012, and has a total obligation of $504,766. The contract falls under the category of Indefinite Delivery Vehicle (IDV) with a type description of FSS.
GONNEVILLE INC is a manufacturer of goods specializing in light truck and utility vehicle manufacturing, as indicated by the NAICS code 336112. The company holds various designations, including being a Service Disabled Veteran Owned Business, a Small Business, a Subchapter S Corporation, and a Veteran Owned Business.
The contract has seen multiple modifications over the years, with the latest transaction recorded on March 29, 2025. The contract has been subject to various modifications, including changes in product descriptions, reassignments, additions of products, and address changes. The contract is set to expire on February 1, 2027.
The contract has been awarded and funded by the General Services Administration, specifically the Federal Acquisition Service. The contract has undergone full and open competition, with no set-asides used. The pricing of the contract is fixed price with economic price adjustment.
The contract has seen a series of transactions over the years, with no loan value and no subsidy cost involved. The transaction amounts have all been recorded as $0, indicating that the contract has not involved any financial transactions beyond the initial obligation amount. The transactions have been primarily modifications to the contract, including changes in product descriptions, reassignments, and additions of products.
Overall, the contract between the US federal government and GONNEVILLE INC for miscellaneous vehicular components under the Federal Supply Schedule Contract has been ongoing since 2012, with multiple modifications and transactions recorded over the years. The contract is set to expire in 2027, and GONNEVILLE INC continues to provide goods as per the contract terms.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GONNEVILLE INC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.