General Services Administration Awarded a Contract to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN for $475,000.00
Signed on
4/10/2017, 12:00 AM
ORMSBY AND THICKSTUN INTERPRETIVE DESIGN Government Contract #GS03F055GA
ORMSBY AND THICKSTUN INTERPRETIVE DESIGN was awarded a contract with the United States Government for $475,000.00. The contract was awarded by the agency office GSA/FAS/GSS/QSCA, MULTIPLE AWARD SCHEDULE CONTRACTING DIVISION, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
The US federal government awarded a Federal Supply Schedule Contract (IDV) with a total obligation of $475,000 to Ormsby and Thickstun Interpretive Design on April 10, 2017. The contract falls under the category of Signs, Advertising Displays, and Identification Plates manufacturing (NAICS code 339950). The contract was solicited using negotiated proposal/quote procedures, with 999 offers received and full and open competition.
Ormsby and Thickstun Interpretive Design, located in Marana, Arizona, is a U.S.-owned small business specializing in interpretive design services. They hold various business certifications, including being a DoT Certified Disadvantaged Business Enterprise, Economically Disadvantaged Women Owned Small Business, and Woman Owned Business.
The contract performance period started on April 11, 2017, and is set to end on April 10, 2027, with a potential end date of April 1, 2025. The contract is a multiple award contract with fixed price and economic price adjustment pricing. The contract does not require a subcontracting plan and is not subject to the Clinger Cohen Act planning.
The funding agency for this contract is the General Services Administration (GSA), specifically the Federal Acquisition Service (FAS) under the Multiple Award Schedule Contracting Division. The awarding agency is also the General Services Administration (GSA) through the Federal Acquisition Service (FAS).
The recipient, Ormsby and Thickstun Interpretive Design, operates out of Marana, Arizona, and specializes in providing interpretive design services. They offer a range of products and services related to signs, advertising displays, and identification plates manufacturing.
Overall, the contract between the US federal government and Ormsby and Thickstun Interpretive Design is a significant opportunity for the small business to showcase their expertise in interpretive design services and contribute to the government's signage and identification needs.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to ORMSBY AND THICKSTUN INTERPRETIVE DESIGN. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.