General Services Administration Awarded a Contract to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC. for $500,000.00
Signed on
8/5/2016, 12:00 AM
CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC. Government Contract #GS00F251DA
CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC. was awarded a contract with the United States Government for $500,000.00. The contract was awarded by the agency office GSA/FAS/PSHC/PROF SRVCS SCHED-PSS, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC. is a U.S.-owned business based in HAINESPORT, NEW JERSEY, specializing in REMEDIATION SERVICES. They were awarded a FEDERAL SUPPLY SCHEDULE CONTRACT by the General Services Administration, funded with $500,000. The contract involves providing OTHER ENVIRONMENTAL SERVICES. Notable transactions show several modifications and actions over the years, all with a Transaction Amount of $0 related to this contract.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to CEMCO-CUSTOM ENVIRONMENTAL MANAGEMENT CO., INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.