0
General Services Administration Awarded a Contract to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC. for $9,500,000.00
Signed on
3/19/2015, 12:00 AM
GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC. Government Contract #GS00F087CA
GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC. was awarded a contract with the United States Government for $9,500,000.00. The contract was awarded by the agency office GSA/FAS/PSHC/PROF SRVCS SCHED-PSS, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
The recipient, GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC., is a U.S.-owned small business based in Atlanta, Georgia. They provide administrative management and general management consulting services.
The federal contract, awarded by the General Services Administration (GSA) through the Federal Acquisition Service (FAS), is a Federal Supply Schedule Contract for professional support services. The contract, signed in 2015, has a total value of $9,500,000 and runs until 2030.
Several transactions show a series of modifications and updates to the contract over the years, with multiple transactions showing no financial amount involved.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to GLOBAL EVALUATION & APPLIED RESEARCH SOLUTIONS (GEARS), INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.