BRIDGECROSS LLC was awarded a contract with the United States Government for $500,000.00. The contract was awarded by the agency office GSA/FAS CENTER FOR IT SCHEDULE PROG, which is a division with the Federal Acquisition Service within the General Services Administration.
Summary of Award
The recipient of the federal contract is BRIDGECROSS LLC, a U.S.-owned business based in Loudoun, Virginia, specializing in IT and telecommunications. The contract, funded by the General Services Administration's Federal Acquisition Service, is for IT and telecommunications services worth $500,000. Multiple transactions have occurred with no monetary value listed, indicating various administrative modifications to the contract over time.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Federal Acquisition Service, a sub agency of General Services Administration, issued a payment of $0.00 to BRIDGECROSS LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.