Department of Energy Awarded a Contract to SAVANNAH RIVER MISSION COMPLETION, LLC for $455,740,193.00
Signed on
6/23/2022, 12:00 AM
SAVANNAH RIVER MISSION COMPLETION, LLC Government Contract #89303722FEM400210
SAVANNAH RIVER MISSION COMPLETION, LLC was awarded a contract with the United States Government for $455,740,193.00. The contract was awarded by the agency office SAVANNAH RIVER OPERATIONS OFFICE, which is a division with the Department of Energy within the Department of Energy.
Summary of Award
The recipient of the federal contract is Savannah River Mission Completion, LLC, which is involved in professional services. The contract, funded by the Department of Energy, is for the Savannah River Integrated Mission Completion Contract - Task Order 5, specifically for Saltstone Disposal Units 10-12, with a total obligation of $176,450,451. Notable transactions related to this contract include multiple payments to the recipient, ranging from $500,000 to $42,668,750, for various activities.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,464,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $595,647.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,464,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,798,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,400,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $595,647.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,464,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,781,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,798,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,400,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $595,647.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,464,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,781,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,798,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,400,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $595,647.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,464,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $37,786,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,781,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,798,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,400,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $595,647.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,464,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $636,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $131,670.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,266,875.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,492,080.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $27,943,125.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,416,250.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,100,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $9,282,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-1,212,643.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,900,143.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,677,300.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,058,750.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $13,044,450.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,656,840.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $250,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $19,288,930.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,096,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,296,310.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,845,110.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $4,114,500.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $194,304.20 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $2,894,214.80 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $12,987,702.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $500,000.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,857,900.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.