0
Department of Energy Awarded a Contract to PIKE NATURAL GAS CO for $1,050,000.00
Signed on
12/29/2023, 12:00 AM
PIKE NATURAL GAS CO Government Contract #89303324CEM000119
PIKE NATURAL GAS CO was awarded a contract with the United States Government for $1,050,000.00. The contract was awarded by the agency office EM-ENVIRONMENTAL MGMT CON BUS CTR, which is a division with the Department of Energy within the Department of Energy.
Summary of Award
The recipient of the federal contract is Pike Natural Gas Co, a U.S.-Owned Business based in Hillsboro, Ohio. The contract, funded by the Department of Energy, is for the transportation of natural gas to the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio. The total obligation for the five-year fixed unit rate contract is $1,050,000. Notable transactions include varying amounts spent throughout the contract period, such as $50,000, $36,000, and $35,000 at different times.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $40,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $15,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $18,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $1,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $36,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $50,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $10,000.00 to PIKE NATURAL GAS CO. The payment included a Subsidy Cost of $0.00.