Department of Energy Awarded a Contract to SAVANNAH RIVER MISSION COMPLETION, LLC for $21,000,000,000.00
Signed on
10/27/2021, 12:00 AM
SAVANNAH RIVER MISSION COMPLETION, LLC Government Contract #89303322DEM000068
SAVANNAH RIVER MISSION COMPLETION, LLC was awarded a contract with the United States Government for $21,000,000,000.00. The contract was awarded by the agency office SAVANNAH RIVER OPERATIONS OFFICE, which is a division with the Department of Energy within the Department of Energy.
Summary of Award
The recipient of the federal contract is Savannah River Mission Completion, LLC, a U.S.-owned business based in Lynchburg, Virginia. The contract, awarded by the Department of Energy's Environmental Management office, is for the Savannah River Site Integrated Mission Completion Contract with a total value of $21 billion. Notable spending includes executive payments to individuals like Thomas Burns and Michael Borders, each receiving $646,000.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $-20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $20,489,794.90 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to SAVANNAH RIVER MISSION COMPLETION, LLC. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.