0
Department of Energy Awarded a Contract to ALEXTON INCORPORATED for $4,254,468.97
Signed on
3/15/2024, 12:00 AM
ALEXTON INCORPORATED Government Contract #89303024CMA000111
ALEXTON INCORPORATED was awarded a contract with the United States Government for $4,254,468.97. The contract was awarded by the agency office HEADQUARTERS PROCUREMENT SERVICES, which is a division with the Department of Energy within the Department of Energy.
Summary of Award
The recipient of the federal contract is Alextion Incorporated, a US-owned small business based in Virginia. They were awarded a definitive contract by the Department of Energy for administrative support services worth $1,576,547.75. The funding agency is also the Department of Energy. Notable spending transactions include amounts of $664,818.31 for one transaction and $144,002 for another.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $144,002.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,607.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $98,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $14,405.81 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $664,818.31 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,986.79 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $68,727.84 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $550,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $16,200.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $144,002.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,607.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $98,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $14,405.81 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $664,818.31 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,986.79 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $68,727.84 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $550,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $69,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $350,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $120,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $92,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $16,200.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $144,002.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,607.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $98,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $14,405.81 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $664,818.31 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,986.79 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $68,727.84 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $550,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $69,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $350,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $120,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $92,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $16,200.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $144,002.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,607.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $98,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $14,405.81 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $664,818.31 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,986.79 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $68,727.84 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $550,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $71,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $69,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $350,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $120,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $92,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $16,200.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $144,002.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,607.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $98,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $14,405.81 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $664,818.31 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,986.79 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $68,727.84 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $550,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $35,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $66,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $11,700.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $150.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $71,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $7,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $3,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $69,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $350,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $120,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $25,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $92,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $80,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $160,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $16,200.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $5,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $144,002.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $6,607.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $98,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $14,405.81 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $664,818.31 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $24,986.79 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $68,727.84 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Department of Energy, a sub agency of Department of Energy, issued a payment of $550,000.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
Department of Energy, a sub agency of Department of Energy, issued a payment of $0.00 to ALEXTON INCORPORATED. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.