Department of the Interior Awarded a Contract to ADVANCED AMERICAN CONSTRUCTION, INC. for $29,318,537.00
Signed on
1/17/2024, 12:00 AM
ADVANCED AMERICAN CONSTRUCTION, INC. Government Contract #140R1024C0001
ADVANCED AMERICAN CONSTRUCTION, INC. was awarded a contract with the United States Government for $29,318,537.00. The contract was awarded by the agency office PACIFIC NW REGION PN 6615, which is a division with the Bureau of Reclamation within the Department of the Interior.
Summary of Award
The recipient of the federal contract is Advanced American Construction, Inc., a U.S.-Owned Business based in Portland, Oregon. The contract is for the replacement of a fish screen at the Roza Diversion Dam, funded by the Department of the Interior's Bureau of Reclamation, with a total obligation of $23,540,961.09. Notable spending includes multiple transactions totaling significant amounts, such as $15,482,863, $1,109,921.09, and $1,150,000, for various project components.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,777,575.91 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,777,575.91 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $80,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,777,575.91 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $80,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,777,575.91 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,323.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $80,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,777,575.91 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $62,083.29 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,719.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,323.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $80,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,777,575.91 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,927.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,500.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $115,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $38,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $26,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $1,109,921.09 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,482,863.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $382,750.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,350,000.00 to ADVANCED AMERICAN CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.