0
Department of the Interior Awarded a Contract to GARCO CONSTRUCTION, INC. for $53,718,820.93
Signed on
9/13/2023, 12:00 AM
GARCO CONSTRUCTION, INC. Government Contract #140R1023C0008
GARCO CONSTRUCTION, INC. was awarded a contract with the United States Government for $53,718,820.93. The contract was awarded by the agency office PACIFIC NW REGION PN 6615, which is a division with the Bureau of Reclamation within the Department of the Interior.
Summary of Award
The recipient of the federal contract is Garco Construction, Inc., a U.S.-Owned Business based in Spokane, Washington. The contract, awarded by the Department of the Interior - Bureau of Reclamation, is for the construction of a fish passage facility in the Yakima River Basin Water Enhancement Project in Washington, totaling $40,410,956.62. Notable spending includes various transaction amounts such as $6,8397.72 and $5,140,000 towards the contract.
Contract Details
Agency Details
Recipient Details
Comments
Award Transactions
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $68,397.72 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,855.15 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,575.20 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,140,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,257,686.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,937,416.26 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,000,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $879,805.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $932,434.95 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,849.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,500,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,600,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $610,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,600.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,200.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,935.16 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,934,867.98 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $7,869.30 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $68,397.72 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,575.20 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $20,977.13 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,855.15 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,140,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $44,960.21 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,257,686.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,937,416.26 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,000,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $879,805.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $932,434.95 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,849.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,500,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,600,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $667.41 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,989.68 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $9,802,620.18 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $11,100.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $110,188.34 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $23,050.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $336,700.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $610,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,600.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,200.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,935.16 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,934,867.98 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $7,869.30 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $68,397.72 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $20,977.13 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,855.15 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,575.20 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,140,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $44,960.21 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,257,686.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,937,416.26 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,000,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $879,805.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $932,434.95 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,849.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,500,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,600,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,700.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,600.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $31,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $667.41 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,989.68 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $9,802,620.18 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $11,100.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $110,188.34 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $23,050.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $336,700.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $610,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,600.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,200.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,935.16 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,934,867.98 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $7,869.30 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $68,397.72 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,575.20 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,855.15 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $20,977.13 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,140,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $44,960.21 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,257,686.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,937,416.26 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,000,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $879,805.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $932,434.95 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,849.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,500,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,600,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $16,735.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,700.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,600.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $12,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $31,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $667.41 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $15,989.68 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $9,802,620.18 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $11,100.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $110,188.34 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $23,050.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $336,700.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $610,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,600.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,200.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $3,934,867.98 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $6,935.16 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $7,869.30 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $68,397.72 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $21,575.20 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,855.15 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $20,977.13 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,140,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $44,960.21 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,257,686.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,937,416.26 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $5,000,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $879,805.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $932,434.95 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $4,849.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $0.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
This payment could indicate a change to the existing contract.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $2,500,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.
Bureau of Reclamation, a sub agency of Department of the Interior, issued a payment of $18,600,000.00 to GARCO CONSTRUCTION, INC.. The payment included a Subsidy Cost of $0.00.