Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR

Sol #36C24226R0033Solicitation

General

Organization:
242-NETWORK CONTRACT OFFICE 02 (36C242)
Department:
VETERANS AFFAIRS, DEPARTMENT OF
Next Response Deadline:
Apr 3, 2026(America/New_York)
Posted:
Mar 26, 2026
Modified:
May 4, 2026
Archive:
N/A

Classification

NAICS:
Commercial and Institutional Building Construction (236220)
Product Service Code (PSC):
MAINTENANCE OF HOSPITALS AND INFIRMARIES(Z1DA)
Set-Aside:
N/A

Place of Performance

Not Specified

Point of Contact

Michael A Spivack(primary)

Description

This amendment provides additional information regarding vendor question 4. From amendment A0010: Drawing 1-ES-100 Detail 1 Calls out new Crawl Space walkway in dotted lines on the drawing. Is this New Crawl Space Contractor provided with this Bid? Can more Detail of what is expected be provided? More info will be needed for pricing If the expectation is that contractor is required to remove the spoils, we would need a route where we could get this out of the building, a place where we could load it into a truck and the time that this work could be performed spelled out. Response: For route to remove spoils, see attached file SUBBASEMENT soil removal path and pictures of conditions of path and loading dock below. All work shall be performed outside of regular business hours, Monday-Friday 4pm-6am and week-ends.

AI Analysis

Scope

constructionrenovationhealthcarecardiacinfrastructurecontractor services
Ceiling Value: N/A
Pricing Model: unknown

Risk Factors

  • need for detailed pricing information
  • removal of spoils logistics
  • work must be performed outside regular business hours
  • potential for unforeseen site conditions
  • coordination with loading dock access

Attachments

loading files....

Files

  • SUBBASEMENT soil removal path.pdf
  • 36C24226R0033 0013.docx
  • 36C24226R0033 0012.docx
  • 36C24226R0033 0011.docx
  • Cath Lab Concept View.pdf
  • IR Lab Concept View.pdf
  • Stratton VA Interior Finish Standards-250613.pdf
  • VA Design Manual.pdf
  • ES-100 clarification spoils earth removal R1.pdf
  • 36C24226R0033 0010.docx
  • 0338 VA RFI-002 03-19-26f.pdf
  • 36C24226R0033 0009.docx
  • 36C24226R0033 0008.docx
  • EXHIBIT C - Past Performance Questionnaire V1.docx
  • 36C24226R0033 0007.docx
  • 36C24226R0033 0006.docx
  • 36C24226R0033 0005.docx
  • EXHIBIT C - Past Performance Questionnaire.docx
  • EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx
  • 36C24226R0033 0004.docx
  • Walkthrough sign in sheet.pdf
  • 36C24226R0033 0003.docx
  • 2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 Percent CD Specifications.pdf
  • 2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume Two 100 Percent CD Specifications.pdf
  • 12-05-25 - VA STRATTON CARDIAC CATH - 100pct SnS.pdf
  • 36C24226R0033 0002.docx
  • 36C24226R0033 0001.docx
  • WD Albany.docx
  • ES-100A ADDENDUM 1.pdf
  • GI-004 ADDENDUM 1.pdf
  • ES-401 ADDENDUM 1.pdf
  • ES-402 ADDENDUM 1.pdf
  • 7-9-25 - VA STRATTON CARDIAC CATH 100 CD SUBMISSION v2.pdf
  • Stratton VAMC Cath Lab 528A8-18-801- Volume Two 100 CD Specifications.pdf
  • Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 CD Specifications.pdf
  • 36C24226R0033_1.docx

Links

No external links have been added to this opportunity