Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina

Sol #N4008526R0138Solicitation

General

Organization:
NAVFACSYSCOM MID-ATLANTIC
Department:
NAVFAC MID-ATLANTIC
Next Response Deadline:
Jun 29, 2026(America/New_York)
Posted:
May 21, 2026
Modified:
May 28, 2026
Archive:
N/A

Classification

NAICS:
Commercial and Institutional Building Construction (236220)
Product Service Code (PSC):
CONSTRUCTION OF MISCELLANEOUS BUILDINGS(Y1JZ)
Set-Aside:
No Set aside used(NONE)

Place of Performance

Camp Lejeune North Carolina, UNITED STATES - 28547

Point of Contact

Andy Bui(primary)
7573411652
Brittany Cristelli(secondary)

Description

The general intent of this solicitation is to award a Fixed Price Construction Contract for a Design-Bid-Build (DBB), construction services for the P-1550 SOF Marine Raider Battalion Company & Team Facilities located at the Marine Corps Base in Camp Lejeune in North Carolina. The project is to provide construction of 6,815 SM (73,400 SF) SOF Marine Battalion Operations, Supply, Communications, and Intel facility; 11,812 SM (127,200 SF) Company HQ and Team Facilities; 1,635 SM (17,600 SF) Company Storage Buildings and miscellaneous supporting structures, utilities, parking, roadways, pedestrian ways/sidewalks, and site work at Stone Bay at the Marine Corps Base (MCB) in Camp Lejeune, North Carolina. The structures will be single-story steel frame buildings with brick veneer over metal studs, standing seam metal roofs, metal soffits, and translucent wall panels. Special construction features include pile foundations, surcharged sites, wetlands mitigation, and storm water best management practices.

AI Analysis

Scope

ConstructionDesign-Bid-BuildMarine FacilitiesSteel Frame BuildingsSite WorkUtilitiesWetlands Mitigation
Ceiling Value: N/A
Pricing Model: Fixed Price
Contract Structure: Fixed Price Construction Contract

Risk Factors

  • Construction delays due to weather conditions
  • Compliance with wetlands mitigation requirements
  • Challenges in managing storm water best practices
  • Potential for cost overruns due to special construction features
  • Coordination with existing site infrastructure

Attachments

loading files....

Files

  • Solicitation - N4008526R0138.pdf
  • 1701820 SITE - FINAL_v2_4 Flattened 2 of 2.pdf
  • 1701820 SITE - FINAL_v2_4 Flattened 1 of 2.pdf
  • 1701820 A1 - FINAL_1.pdf
  • 1701820 A2 - FINAL_2.pdf
  • 1701820 A3 - FINAL_3.pdf
  • 1701820 SPC -FINAL.pdf
  • Attachment E - Past Performance Questionnaire.pdf
  • Attachment B - PIEE Vendor Access Instructions.pdf
  • Attachment H -Small Business Subcontracting Plan.docx
  • Attachment F - Historical Small Business Utilization.docx
  • Attachment D - Construction and Design Experience Project Data Sheet.docx
  • Attachment G - SPCD.docx
  • Attachment C - Price Proposal Form.docx
  • Attachment A - Pre-Proposal Inquiry (PPI) Log.xlsx

Links

No external links have been added to this opportunity