Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Sol #N4008526R0138Solicitation
General
Organization:
NAVFACSYSCOM MID-ATLANTICDepartment:
NAVFAC MID-ATLANTICNext Response Deadline:
Jun 29, 2026(America/New_York)
Posted:
May 21, 2026Modified:
May 28, 2026Archive:
N/AClassification
NAICS:
Commercial and Institutional Building Construction (236220)
Product Service Code (PSC):
CONSTRUCTION OF MISCELLANEOUS BUILDINGS(Y1JZ)
Set-Aside:
No Set aside used(NONE)
Place of Performance
Camp Lejeune North Carolina, UNITED STATES - 28547
Point of Contact
Brittany Cristelli(secondary)
Description
The general intent of this solicitation is to award a Fixed Price Construction Contract for a Design-Bid-Build (DBB), construction services for the P-1550 SOF Marine Raider Battalion Company & Team Facilities located at the Marine Corps Base in Camp Lejeune in North Carolina. The project is to provide construction of 6,815 SM (73,400 SF) SOF Marine Battalion Operations, Supply, Communications, and Intel facility; 11,812 SM (127,200 SF) Company HQ and Team Facilities; 1,635 SM (17,600 SF) Company Storage Buildings and miscellaneous supporting structures, utilities, parking, roadways, pedestrian ways/sidewalks, and site work at Stone Bay at the Marine Corps Base (MCB) in Camp Lejeune, North Carolina. The structures will be single-story steel frame buildings with brick veneer over metal studs, standing seam metal roofs, metal soffits, and translucent wall panels. Special construction features include pile foundations, surcharged sites, wetlands mitigation, and storm water best management practices.
AI Analysis
Scope
ConstructionDesign-Bid-BuildMarine FacilitiesSteel Frame BuildingsSite WorkUtilitiesWetlands Mitigation
Ceiling Value: N/A
Pricing Model: Fixed Price
Contract Structure: Fixed Price Construction Contract
Risk Factors
- Construction delays due to weather conditions
- Compliance with wetlands mitigation requirements
- Challenges in managing storm water best practices
- Potential for cost overruns due to special construction features
- Coordination with existing site infrastructure
Attachments
loading files....Files
- Solicitation - N4008526R0138.pdf
- 1701820 SITE - FINAL_v2_4 Flattened 2 of 2.pdf
- 1701820 SITE - FINAL_v2_4 Flattened 1 of 2.pdf
- 1701820 A1 - FINAL_1.pdf
- 1701820 A2 - FINAL_2.pdf
- 1701820 A3 - FINAL_3.pdf
- 1701820 SPC -FINAL.pdf
- Attachment E - Past Performance Questionnaire.pdf
- Attachment B - PIEE Vendor Access Instructions.pdf
- Attachment H -Small Business Subcontracting Plan.docx
- Attachment F - Historical Small Business Utilization.docx
- Attachment D - Construction and Design Experience Project Data Sheet.docx
- Attachment G - SPCD.docx
- Attachment C - Price Proposal Form.docx
- Attachment A - Pre-Proposal Inquiry (PPI) Log.xlsx