Refinishing of Gymnasium Floors
Sol #N4008526R0012Combined Synopsis/Solicitation
General
Organization:
NAVFACSYSCOM MID-ATLANTICDepartment:
NAVFAC MID-ATLANTICNext Response Deadline:
May 21, 2026(America/New_York)
Posted:
Apr 21, 2026Modified:
May 8, 2026Archive:
N/AClassification
NAICS:
Flooring Contractors(238330)
Product Service Code (PSC):
MAINTENANCE OF RECREATIONAL BUILDINGS(Z1FB)
Set-Aside:
Total Small Business Set-Aside (FAR 19.5)(SBA)
Place of Performance
Camp Lejeune North Carolina, UNITED STATES - 28547
Point of Contact
Description
The Contractor shall provide all labor, management, supervision, tools, materials, and equipment required to perform floor services at various locations throughout the Marine Corps Base Camp Lejeune, Marine Corps Air Station New River, Camp Geiger, Camp Johnson, Rifle Range, Court House Bay, Jacksonville North Carolina.
AI Analysis
Scope
floor refinishinglabor servicesmanagementsupervisiontools and materialsMarine CorpsNorth Carolina
Ceiling Value: N/A
Pricing Model: unknown
Risk Factors
- potential delays due to weather conditions
- availability of materials and equipment
- scheduling conflicts with base operations
- compliance with safety regulations
Attachments
loading files....Files
- Solicitation N4008526R0012.pdf
- Statement of Work (SOW).pdf
- J -1503010 - Deliveries or Performance.pdf
- J -1503010 Table of Contents.pdf
- J-1503010-01 Definitions and Acronyms.pdf
- J-1503010-02 Reference andTechnical.pdf
- J -1503010-03 Maps and Locations.pdf
- J-1503010-04 Floor Plans.pdf
- J -1503010-05 Square Footage.pdf
- J-1503010-06 Requirements.pdf
- J -1503010-07 PAP.pdf
- 1503010-08 FAP Gymnasium Floors.pdf
- J-0200000 Table of Contents.pdf
- J-0200000-01 Definitions and Acronyms.pdf
- J-0200000-02 Wage Determination.pdf
- J-0200000-03 Directives Instructions and References.pdf
- J-0200000-04 Invoice Form.pdf
- J-0200000-05-1 CSIR.pdf
- J-0200000-05-2 Motor Vehicle Accident Report.pdf
- J-0200000-05-3 Contractor Hazardous Material Inventory Log.pdf
- J-0200000-06 ELIN Proposal (FY26).pdf